The problem
Water damage had ruined the wood floor of a Tribeca apartment, and the damaged flooring had to come out completely.
Preparation
After demolition, the concrete slab was leveled so the new floor would sit flat and stay quiet.
Materials and method
A prefinished engineered oak floor in a 5-inch plank was installed over the prepared slab.
The result
A new engineered oak floor in place of the water-damaged one, on a leveled slab that is ready to last.



Get an estimate
Call 718-316-5330 or email nycfloorpro@gmail.com for an estimate. NYC Floor Pro, 238 East 60th Street, New York, NY 10022.