Hardwood Floor Installation in NYC

Installing new hardwood floors

A hardwood floor is a long-term investment, and the subfloor underneath matters as much as the wood you see. NYC Floor Pro has served New York City since 2011, with over 30 years of hands-on flooring experience.

We check the subfloor before quoting, so the price reflects what is actually under your old floor. Then we help you pick the wood, with samples from our Manhattan showroom, so the floor fits your home and your building’s requirements.

  • SUBFLOOR CHECK. We review your structure, particularly the subfloor, before recommending a method: nail-down over a wood subfloor, or leveling, soundproofing and glue-down over concrete.
  • WOOD SELECTION. We guide you through solid, engineered and laminate options, with samples to match your home.

Types of flooring we install

  • SOLID WOOD: The classic choice, available prefinished or unfinished in a wide range of species, colors and grades. Solid wood can be sanded and refinished many times, making it the longest-lasting option.
  • ENGINEERED WOOD: Real wood over a stable multilayer core. More resistant to changes in humidity, and the usual choice over concrete slabs.
  • LAMINATE: A budget-friendly option that imitates the look of wood. Easy to install and maintain, though it cannot be refinished.

A written estimate before any work

Every project starts with a written estimate, and NYC Floor Pro warranties all installations for 2 years. Get an estimate through the form below or call 718-316-5330.

Please fill in our form below and we’ll contact you as soon as possible.
Name
Address
How can we help?

Choosing solid vs engineered

Over a concrete slab, engineered hardwood installed by full glue-down is the right choice in almost every case. Over a wood subfloor, both solid and engineered work. We recommend after examining your space – see our engineered hardwood installation page for details.

What installation week looks like

We protect hallways and common areas as your building requires, phase the work room by room when you stay in the home, and walk the finished floor with you at the end. Most apartments take 3-5 days of installation, not including acclimation. We usually deliver the wood at least one week before installation. Projects that require shifting furniture are scheduled in phases; empty apartments are not.

Common questions

1. How long does installation take?
Most apartments take 3-5 days of installation, not including acclimation. We usually deliver the wood at least one week before installation. Projects that require shifting furniture are scheduled in phases; empty apartments are not.

2. Do I have to move out?
Usually not for a single room. When furniture needs shifting, we phase the work room by room.

3. Solid or engineered?
We recommend based on your subfloor: engineered over concrete, either over wood subfloors.

4. Do you handle my building’s paperwork?
Yes – the certificate of insurance once the agreement is signed, plus alteration-agreement requirements.

5. Is the wood included?
We can supply from our showroom lines or install wood you have purchased.

Related: hardwood floor refinishing, hardwood floor repair, subfloor preparation and leveling.